Demolition of the existing lean-to extension and construction of a new single storey rear and side extension
📊
See the success rate & inspector analytics
Free to view — just create an account, no payment needed.
Sign Up FreeTechnical Issues Heatmap
Residential Amenity
Extensions
Inspector’s Reasoning
Appeal Decision
Site visit made on 26 September 2017
by Michael Boniface MSc MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 28th September 2017
Appeal Ref: APP/K3605/D/17/3181020
26 Thames Street, Walton-on-Thames, KT12 2PS
The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
The appeal is made by Mr Darren Blake against the decision of Elmbridge Borough
Council.
The application Ref 2017/0765, dated 13 March 2017, was refused by notice dated
5 May 2017.
The development proposed is demolition of the existing lean-to extension and
construction of a new single storey rear and side extension.
Decision
1. The appeal is allowed and planning permission is granted for demolition of the
existing lean-to extension and construction of a new single storey rear and side
extension at 26 Thames Street, Walton-on-Thames, KT12 2PS in accordance
with the terms of the application, Ref 2017/0765, dated 13 March 2017,
subject to the following conditions:
1) The development hereby permitted shall begin not later than 3 years
from the date of this decision.
2) The development hereby permitted shall be carried out in accordance
with the following approved plans: 0010-GA, 0020-GA, 0040-GA,
0200-GA and 0400-GA.
3) The external surfaces of the development hereby permitted shall be
constructed using materials matching that of the existing building.
Main Issue
2. The main issue is the effect on the living conditions of neighbouring occupants
at 28 Thames Street.
Reasons
3. The proposed addition would extend to a depth of 3.8 metres along the
boundary with No 28 and stand at a height of 3 metres, incorporating a flat
roof. The extension would be deeper than the existing lean-to extension to be
demolished and taller in part, where the sloping roof reduces to eaves level.
That said, it would be significantly lower than the highest point of the existing
extension which also stands directly adjacent the boundary.
4. Some additional overshadowing may result to the adjacent property but equally
there is likely to be some improvement in the amount of sunlight that can pass
Appeal Decision APP/K3605/D/17/3181020
2
over the top of the building and reach the large glazed doors in the rear
elevation of No 28. The extension would breach a 45 degrees angle from the
centre of the neighbouring window but this would also be the case for the
extension granted planning permission by the Council and the existing
extension. Importantly, a 45 degrees angle on elevation would clear the top of
the proposed extension, indicating that sunlight is likely to be able to pass over
it without undue overshadowing.
5. The orientation of the dwellings is such that their rear elevations only receive
direct sunlight for short periods of the morning before the suns path takes it
around the building. As such, any additional overshadowing will only have an
effect for a short period of the day. Noting the potential for both losses and
gains in sunlight from different parts of the proposal, I do not consider that the
development would have any discernible impact on the amount of sunlight or
daylight received by the neighbouring property, particularly given the large size
of the opening at ground floor level. Living conditions would not be harmed.
6. As such, I find no conflict with Policy CS17 of the Elmbridge Core Strategy
(2011); Policy DM2 of the Development Management Plan (2015); the
Elmbridge Design and Character Supplementary Planning Document (2012); or
the National Planning Policy Framework, in so far as they seek to maintain
good living conditions for existing and future occupants of land and buildings.
7. The Council has suggested a number of conditions in the event that planning
permission is granted. In addition to the standard time period for
commencement of development, I have attached a requirement for accordance
with the approved plans in the interests of certainty. It is also necessary to
ensure the use of materials matching the existing building so as to achieve a
suitable appearance for the development.
8. In light of the above, and having considered all other matters, the appeal is
allowed.
Michael Boniface
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.