← Back to Archive

Erection of 1 No 2.5MW wind turbine (80m to hub, 120m to blade tip) and construction of associated access tracks

πŸ“Š

Borough Success Rate

In Doncaster Metropolitan Borough Council, approx 0.0% of Other Major Developments appeals are successful. (Sample: 6 cases).

Planzo Professional Representation

Technical Appeal Representation

This Other Major Developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works β†’

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Major PJ

Archive Data: 10 Decisions
Allowance Rate (Other Major Developments)
30.0% ↓ Strict
National Average (Other Major Developments)
43.4%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Site visit made on 2 October 2018 by Philip Major BA(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State Decision date: 1st November 2018 Appeal Ref: APP/F4410/W/17/3177084 Greengate Road, Norton, Doncaster WF8 3LT ο‚· The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refu…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (Β£10)