Appeal Decision
Site visit made on 7 March 2017
by V Lucas-Gosnold LLB MCD MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 24th March 2017
Appeal Ref: APP/R0660/D/17/3168881
The Chase, Trouthall Lane, Plumley, WA16 9RZ
The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to grant planning permission.
The appeal is made by Mr S Ashworth against the decision of Cheshire East Council.
The application Ref 16/5429M, dated 8 November 2016 , was refused by notice dated
23 January 2017.
The development proposed is a first floor extension to provide a master bedroom suite .
Decision
1. The appeal is dismissed.
Application for costs
2. An application for costs was made by Mr S Ashworth against Cheshire East
Council. This application is the subject of a separate Decision.
Procedural Matter
3. Both parties have referred to several local and national policies in their
submissions. I have only specifically referred to those policies that I consider
most relevant to my Decision. Whilst Cheshire East’s emerging Local Plan is at
an advanced stage, it has not yet been adopted and no policies from this
document are identified in the Council’s decision notice.
Main Issues
4. The main issues are:
Whether the proposal would be inappropriate development in the Green
Belt having regard to any relevant development plan policies and the
National Planning Policy Framework (Framework);
The effect of the development proposed on the openness of the Green
Belt; and
If the proposal would be inappropriate development whether the harm
by reason of inappropriateness, and any other harm, is clearly
outweighed by other considerations so as to amount to the very special
circumstances necessary to justify it.
Appeal Decision APP/R0660/D/17/3168881
2
Reasons
Whether inappropriate
5. ‘The Chase’ is an existing dwelling in the Green Belt. The appeal proposal would
see the construction of a first floor extension.
6. Policy GC12 of the Macclesfield Borough Local Plan (Adopted 2004) (LP) seeks
to ensure that alterations and extensions to existing houses in the countryside
are up to 30% of the original floor space providing the scale and appearance of
the house would not be significantly altered. Exceptions to this include where
the proposal is in a group of houses or ribbon development. The policy also
seeks to ensure that there would be no harm to the character and appearance
of the countryside.
7. Paragraph 89 of the National Planning Policy Framework (Framework) states
that the construction of new buildings in the Green Belt should be regarded as
inappropriate. Exceptions to this include the extension or alteration of a
building provided that it does not result in disproportionate additions over and
above the size of the original building.
8. There are some slight differences between the local policy and the Framework,
specifically there is no specific quantitative measure identified in paragraph 89
as to what would represent a ‘disproportionate addition’. Rather this is left as a
matter of planning judgement. There is also no requirement in paragraph 89
for proposed extensions to be acceptable in terms of the effect on the character
and appearance of the area, although this is dealt with elsewhere in the
Framework. I therefore attach no weight to this specific element of the policy
in accordance with paragraph 215 in terms of assessing whether or not the
proposal would represent inappropriate development. However, the general
thrust of policy GC12 in seeking to restrict the size of extensions to existing
houses in the Green Belt is broadly consistent with the aims of the specific
paragraph 89 exception and I therefore attach moderate weight to this aspect
of the policy.
9. In assessing whether the size of the appeal proposal would represent a
disproportionate addition, it is necessary to compare this with the size of the
original building as set out in paragraph 89. There is some dispute between
the parties regarding this. Whilst I note the appellant’s reference to a legal
judgement1 in this respect, that case related to the interpretation of the
General Permitted Development)(England) Order 2015 Part 1 Class A (GPDO)
and the meaning of the terms ‘dwellinghouse enlarged’, ‘existing dwelling’ and
the ‘original dwelling’ when used in specific sections of the GPDO.
10. Paragraph 89 specifically refers to the ‘original building’. This is defined in
Annex 2 of the Framework as a building as it existed on 1 July 1948 or, if
constructed after 1 July 1948, as it was built originally. There is nothing to
suggest in the Framework’s definition of ‘original building’ that permitted
development that has been built after the original building has been
constructed should be excluded from the definition.
11. For these reasons, as the permitted development rear extension does
represent an addition to the appeal dwelling as it was originally constructed as
1 Hilton v Secretary of State for Communities and Local Government (CO/309/2016)
Appeal Decision APP/R0660/D/17/3168881
3
it does not form part of the ‘original building’. I shall therefore have regard to
this extension in making my overall assessment of the appeal proposal.
12. A previous appeal2 at ‘The Chase’ approved a single storey front extension and
a two storey rear extension. This represented an approximate 49% increase in
floorspace over and above the size of the original dwelling and the scheme has
been implemented. Since the appeal was allowed, the single storey permitted
development rear extension scheme has also been implemented. When the
floorspace of this extension is added to that of the previous scheme this
represents an approximate 60 % increase in floor space when compared with
the original building.
13. The appeal proposal before me is for a first floor extension that would follow
the curve of the rear extension above the single storey element. When the
additional floorspace proposed is added to that of the other extensions under
construction then this would represent an approximate 91% increase over and
above the original building.
14. The appeal dwelling is a substantial property and if the proposal were to be
judged on the amount of additional floorspace alone then the size increase
would be substantial. Percentage increases in floorspace are also a useful
guide as this assessment takes into account the relative size of the original
building and so the comparison is more meaningful when assessing the merits
of a scheme. The appeal proposal would amount to a 91% increase in
floorspace, taking into account the other extensions, over and above the
floorspace of the original building. Whilst the appeal dwelling is a substantial
property, a percentage increase of this size would clearly amount to a
significant increase that would represent disproportionate additions for the
purposes of paragraph 89 of the Framework. Whilst I note the appellant’s
comments, both local and national policy exceptions necessitate some form of
size comparison to occur so as to reach a conclusion on whether the proposed
increase would be ‘disproportionate’.
15. The previous Inspector concluded, amongst other things, that the appeal
dwelling formed part of a ribbon of development and therefore the 30% limit
referred to in policy GC12 did not apply. Whilst I have taken this finding into
account, there is nothing in the policy to suggest that if a proposal falls within
one of the exceptions listed that it necessarily follows that there is no upper
limit to the size of extensions that would be permitted in the Green Belt.
Indeed, that would be contrary to national policy as set out in paragraph 89 of
the Framework.
16. Whilst the previous appeal may have considered a rear two storey extension
acceptable, the floorspace of that scheme was less than that of the proposal
before me and at that time the permitted development extension had not been
constructed and was considered to be a ‘fall-back position. The situation has
therefore changed considerably since the previous Inspector made their
assessment of the site.
17. Accordingly, I conclude on this issue that the development proposed would
result in disproportionate additions over and above the size of the original
building. The proposal would therefore be inappropriate development as
described in paragraph 89 of the Framework and policy GC12 of the LP.
2 APP/R0660/D/16/3152865 Decision date: August 2016
Appeal Decision APP/R0660/D/17/3168881
4
Openness
18. Although the proposed extension may be situated to the rear of the house and
not readily visible form Trouthall Lane, an assessment of openness includes a
spatial dimension. The proposal would add to the bulk of development on the
appeal site. It would result in additional development at first floor level where
there is currently none and would extend the mass of the appeal building at the
rear, albeit to a limited extent taking account of the extensions currently under
construction. The proposal would therefore have a limited negative effect on
the openness of the Green Belt.
19. Whilst paragraph 89 of the Framework and policy GC12 of the LP may not
specifically refer to ‘openness’ , paragraph 79 of the Framework confirms that
this is one of the essential characteristics of Green Belts. It is therefore a
relevant planning consideration.
20. Based on the information before me, the proposal would not conflict with any
of the five purposes of the Green Belt set out in paragraph 80 of the
Framework. However, a lack of harm does not weigh in favour of the proposal
and this consideration does not form part of the Council’s case in any event.
Any other circumstances
21. I note the appellant’s intention to provide accommodation for elderly relatives
at some point in the future and attach limited weight in favour to this
consideration.
22. Based on the information before me, the proposal would be acceptable in terms
of parking and access, the effect on the living conditions of neighbouring
occupants, protected trees and in design terms. There would also be no harm
to the character and appearance of the countryside as a consequence of the
proposal or an intensification of the existing use. These are however neutral
matters whereby a lack of harm does not weigh in favour of the appeal
scheme.
23. Whilst I note the Parish Council may have indicated support for the proposal
and there may have been no objections from neighbouring properties, I have
assessed this appeal on its own merits and with regard to relevant local and
national policy.
24. I note the appellant’s comments regarding how the Council dealt with reaching
a decision on the original application. However, my determination of this
appeal has been based only on the planning merits of the case before me.
Conclusion
25. Drawing matters together, I have found that the development proposed would
be inappropriate development in the Green Belt as it would result in
disproportionate additions over and above the size of the original building. The
proposal would also have a limited negative effect on the openness of the
Green Belt. Paragraph 88 of the Framework confirms that great weight should
be given to any harm to the Green Belt and I do so accordingly.
26. On the other hand, I have attached limited weight in favour to the appellant’s
intention to provide accommodation for elderly relatives at some point in the
future. I have also identified several neutral considerations that do not weigh
Appeal Decision APP/R0660/D/17/3168881
5
in favour of the proposal. I conclude that these other considerations do not
clearly outweigh the totality of harm I have identified. Accordingly, very
special circumstances necessary to justify the development do not exist and
the proposal would therefore conflict with paragraph 89 of the Framework and
policy GC12 of the LP.
27. For the reasons given above, I conclude that the appeal should be dismissed.
V Lucas-Gosnold
INSPECTOR
£
Costs decision section
Costs Decision
Site visit made on 7 March 2017
by V Lucas-Gosnold LLB MCD MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 24th March 2017
Costs application in relation to Appeal Ref: APP/R0660/D/17/3168881
The Chase, Trouthall Lane, Plumley, Knutsford, WA16 9RZ
The application is made under the Town and Country Planning Act 1990, sections 78,
322 and Schedule 6, and the Local Government Act 1972, section 250(5).
The application is made by Mr S Ashworth for a partial or full award of costs against
Cheshire East Council.
The appeal was against the refusal of planning permission for a f irst floor extension to
provide a master bedroom suite.
Decision
1. The application for an award of costs is refused.
Reasons
2. Irrespective of the outcome of an appeal, costs may only be awarded against a
party who has behaved unreasonably, in either a procedural or substantive
way, and thereby caused the party applying for costs to incur unnecessary or
wasted expense in the appeal process. I shall therefore consider whether that
has occurred in this case.
3. The applicant has referred to whether or not the Council interpreted the
relevant local policy correctly when assessing the development proposed and
that the Council attached undue weight to the said policy. I have set out in my
appeal Decision that whilst the relevant 30% exception may have been
engaged, it did not necessarily follow that there was no upper limit to the size
of extensions that would be permitted and that such an approach would conflict
with national policy set out in paragraph 89 of the National Planning Policy
Framework (Framework). In any event, as I concluded in my Decision if the
extension being constructed under Permitted Development rights (PD) is taken
in to account the appeal proposal would result in an increase in floorspace far
in excess of 30%. Therefore notwithstanding the previous appeal1, the Council
did not seek to apply this element of policy GC12 of the Macclesfield Borough
Local Plan (2004).
4. In my Decision I found that policy GC12 does differ from the specific exception
set out in paragraph 89 of the Framework. However, the general thrust of the
policy does reflect that of the relevant national policy and for that reason I
attached some weight to the local policy. In accordance with paragraph 215 of
the Framework, the Council was therefore entitled to attach some weight to the
policy in reaching their decision. Whilst previous Inspector’s may have noted
1 APP/R0660/D/16/3152865 Decision date: August 2016
Costs Decision APP/R0660/D/17/3168881
www.planningportal.gov.uk/planninginspectorate 2
that the policy was more restrictive than the Framework they still attached
weight to the policy in their Decision.
5. As noted in my appeal Decision, whether or not a proposal would harm the
character or appearance of an area is not a relevant Green Belt test set out in
national policy and in accordance with paragraph 215 of the Framework the
Council were correct not to attach weight to this element of the policy when
assessing whether or not the proposal would be inappropriate development in
the Green Belt.
6. As to whether or not the Council provided objective evidence to support their
reason for refusal. The relevant policy test required a comparison of the size of
the appeal proposal compared with that of the original building, taking account
of the extension subsequently permitted on appeal and the PD extension. The
officer’s report includes a specific analysis of the various floorspace increases
when compared with the original building and a percentage increase was also
calculated so as to provide a further point of comparison. There is also
additional text commentary where the officer went on to consider whether the
proposal would be seen as disproportionate, in combination with the other
extensions, when compared with the original building. On that basis, I
therefore conclude that the Council did provide objective evidence to support
their reason for refusal and demonstrated that the proposal would be contrary
to policy.
7. Whether or not the proposal would comply with the relevant policies is a matter
of planning judgement. The Council gave clear and precise reasons for
reaching the decision that they came to, they reached a clear conclusion on the
application and identified relevant policies from their Local Plan.
8. Accordingly, I conclude that unreasonable behaviour leading to wasted expense
has not been demonstrated.
9. For the reasons given above, I refuse the application for an award of costs.
V Lucas-Gosnold
INSPECTOR
Expert Representation
Don't leave your appeal to chance.
Inspectors are inconsistent. We build a technical defense using precedents from our 182,000+ case archive.
No win, no fee Householder representation — you only pay if you win.