← Back to Archive

Demolition of part of rear elevation of common circulation space at upper first floor level of 19 Palace Gate. Part of flat roof at upper ground floor level over Flat 8. Removal of existing window and door casements at the front and rear of Flat 3. Removal of part of boundary railings at upper first floor level between no 19 and no 17. Proposed new extension study room at upper first floor level accessed from circulation space. New roof light to rear flat roof of Flat 8. Install new

📊

Borough Success Rate

In Royal Borough of Kensington and Chelsea, approx 42.1% of Other minor developments appeals are successful. (Sample: 373 cases).

Planzo Professional Representation

Technical Appeal Representation

This Other minor developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Cassini H

Archive Data: 42 Decisions
Allowance Rate (Other minor developments)
40.5% ↑ High
National Average (Other minor developments)
32.5%

Inspector's Analysis

Appeal Decision Site visit made on 14 March 2017 by Helen Cassini BSc(Hons) DipTP MRTPI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 03 April 2017 Appeal Ref: APP/K5600/W/16/3164566 Flat 3 and Flat 8, 19 Palace Gate, London W8 5LS  The appeal is made under section 78 of the Town and Country Planning Act 1990 against a refusal to …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)