Demolition of part of rear elevation of common circulation space at upper first floor level of 19 Palace Gate. Part of flat roof at upper ground floor level over Flat 8. Removal of existing window and door casements at the front and rear of Flat 3. Removal of part of boundary railings at upper first floor level between no 19 and no 17. Proposed new extension study room at upper first floor level accessed from circulation space. New roof light to rear flat roof of Flat 8. Install new
📊
Borough Success Rate
In Royal Borough of Kensington and Chelsea, approx 42.1% of Other minor developments appeals are successful. (Sample: 373 cases).
Planzo Professional Representation
Technical Appeal Representation
This Other minor developments case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Cassini H
Archive Data: 42 Decisions
Allowance Rate (Other minor developments)
40.5%
↑ High
National Average (Other minor developments)
32.5%
Inspector's Analysis
Appeal Decision
Site visit made on 14 March 2017
by Helen Cassini BSc(Hons) DipTP MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 03 April 2017
Appeal Ref: APP/K5600/W/16/3164566
Flat 3 and Flat 8, 19 Palace Gate, London W8 5LS
The appeal is made under section 78 of the Town and Country Planning Act 1990
against a refusal to …