← Back to Archive

Material change of use of the Land from the installation and operation of a wood-waste biomass-fuelled renewable energy plant to a use for the importation, deposit and storage of waste, wholly unconnected to, and unsuitable for the purposes of, the installation and operation of a wood-waste biomass-fuelled renewable energy plant

📊

Borough Success Rate

In Hertfordshire County Council, approx 0.0% of Change of use appeals are successful. (Sample: 1 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Peerless KJ

Archive Data: 5 Decisions
Allowance Rate (Change of use)
80.0% ↑ High
National Average (Change of use)
32.5%

Inspector's Analysis

https://www.gov.uk/planning-inspectorate Appeal Decision Inquiry Held on 10 – 12 July 2018 Site visit made on 12 July 2017 by Katie Peerless Dip Arch RIBA an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 21 August 2018 Appeal Ref: APP/M1900/C/16/3163980 Navitas Environmental Ltd, Appspond Lane, Potters Crouch, St Albans, Herts …

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)