← Back to Archive

Breaches of planning control as alleged in the notice is “Without planning permission, the material change of use of the Land from B8 (Storage and distribution) to a Skip Hire and waste sorting yard (Sui Generis) (“the Unauthorised Use”) and Without planning permission the construction of a sorting shelter and the siting of portable buildings (“the Unauthorised Development”) on the Land

📊

Borough Success Rate

In Sandwell Metropolitan Borough Council, approx 49.0% of Change of use appeals are successful. (Sample: 49 cases).

Planzo Professional Representation

Technical Appeal Representation

This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: No Inspector Associated

Archive Data: 54 Decisions
Allowance Rate (Change of use)
38.9% ↑ High
National Average (Change of use)
32.5%

Inspector's Analysis

http://www.planning-inspectorate.gov.uk Appeal Decision by Ken McEntee a person appointed by the Secretary of State for Communities and Local Government Decision date: 18th May 2017 Appeal ref: APP/G4620/C/16/3161898 Land at 1 Skip Hire Ltd, Palace Drive, Smethwick, West Midlands, B66 1NZ  The appeal is made under section 174 of the Town and Country Planning Act 1990, as amended…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)