Breaches of planning control as alleged in the notice is “Without planning permission, the material change of use of the Land from B8 (Storage and distribution) to a Skip Hire and waste sorting yard (Sui Generis) (“the Unauthorised Use”) and Without planning permission the construction of a sorting shelter and the siting of portable buildings (“the Unauthorised Development”) on the Land
📊
Borough Success Rate
In Sandwell Metropolitan Borough Council, approx 49.0% of Change of use appeals are successful. (Sample: 49 cases).
Planzo Professional Representation
Technical Appeal Representation
This Change of use case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: No Inspector Associated
Archive Data: 54 Decisions
Allowance Rate (Change of use)
38.9%
↑ High
National Average (Change of use)
32.5%
Inspector's Analysis
http://www.planning-inspectorate.gov.uk
Appeal Decision
by Ken McEntee
a person appointed by the Secretary of State for Communities and Local Government
Decision date: 18th May 2017
Appeal ref: APP/G4620/C/16/3161898
Land at 1 Skip Hire Ltd, Palace Drive, Smethwick, West Midlands, B66 1NZ
The appeal is made under section 174 of the Town and Country Planning Act 1990, as
amended…