Breach of planning control as alleged in the notice is, without planning permission, the material change of use of the land from (Sui Generis) storage before and after processing and processing of excavated/dredged/builders materials, timber with associated plant and machinery to a mixed use comprising the storage before and after processing and processing of excavated/dredged/builders materials, timber with associated plant and machinery and skip hire, ship storage and skip distribution
📊
Borough Success Rate
In Royal Borough of Windsor and Maidenhead, approx 62.5% of Minor general industry/storage/warehousing appeals are successful. (Sample: 8 cases).
Planzo Professional Representation
Technical Appeal Representation
This Minor general industry/storage/warehousing case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Freer P
Archive Data: 3 Decisions
Allowance Rate (Minor general industry/storage/warehousing)
0.0%
↓ Strict
National Average (Minor general industry/storage/warehousing)
37.1%
Inspector's Analysis
Appeal Decisions
Inquiry held on 10, 11, 12 and 17 May 2017
Site visits made on 10 and 17 May 2017
by Paul Freer BA (Hons) LLM MRTPI
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 20 June 2017
Appeals Ref: APP/T0355/C/16/3159536 and 3159537
Land at Hythe End Farm, Hythe End Road, Wraysbury TW19 5AW
The appeals are made under sectio…