← Back to Archive

Winning and working of minerals, the erection of a low profile processing plant, workshop, site office, welfare unit, weighbridge and wheel cleaner and other ancillary buildings with restoration using pre-treated imported suitable inert materials to return the land to agricultural use

📊

Borough Success Rate

In London Borough of Havering, approx 100.0% of Mineral working appeals are successful. (Sample: 1 cases).

Planzo Professional Representation

Technical Appeal Representation

This Mineral working case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: Roscoe S

Archive Data: 3 Decisions
Allowance Rate (Mineral working)
66.7% ↑ High
National Average (Mineral working)
41.3%

Inspector's Analysis

www.planningportal.gov.uk/planninginspectorate Appeal Decision Hearing held on 21 and 22 March 2017 Site visit made on 22 March 2017 by Stephen Roscoe BEng MSc CEng MICE an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 04 May 2017 Appeal Ref: APP/B5480/W/16/3159082 Land Adjacent to Wennington Hall Farm, New Road, Wennington  Th…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)