Demolition of the existing single storey rear storage buildings and main building roof and erection of a replacement roof with internal accommodation, reconfiguration of existing first floor to form new dwellings and erection of a rear 2.5 storey extension with internal residential accommodation
📊
Borough Success Rate
In Harlow District Council, approx 30.8% of Major dwellings appeals are successful. (Sample: 13 cases).
Planzo Professional Representation
Technical Appeal Representation
This Major dwellings case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.
Technical Issues Heatmap
Instant scan of technical battlegrounds available with a Day Pass.
Inspector Profile: Gilbert-Wooldridge T
Archive Data: 37 Decisions
Allowance Rate (Major dwellings)
43.2%
↑ High
National Average (Major dwellings)
41.1%
Inspector's Analysis
Appeal Decision
Site visit made on 12 December 2016
by Tom Gilbert-Wooldridge BA (Hons) MTP MRTPI IHBC
an Inspector appointed by the Secretary of State for Communities and Local Government
Decision date: 27th January 2017
Appeal Ref: APP/N1540/W/16/3156500
38-48 High Street, Harlow CM17 0DN
The appeal is made under section 78 of the Town and Country Planning Act 1990
against a failure…