← Back to Archive

Without planning permission, the partial, and apparently ongoing, construction of a stone and brick built building in the approximate position that is outlined in blue on the attached plan numbered DB 1 (“the Incomplete Building”). For the purposes of identification, all that can be seen of the Incomplete Building on the attached photograph numbered DB 2 has been outlined in green

📊

Borough Success Rate

In Staffordshire Moorlands District Council, approx 0.0% of Not Applicable appeals are successful. (Sample: 0 cases).

Planzo Professional Representation

Technical Appeal Representation

This Not Applicable case requires a bespoke technical strategy. Contact us for a fixed-fee quotation.

Book Free Review How it works →

Technical Issues Heatmap

Green Belt Character and Appearance Privacy
Keyword Heatmap Locked

Instant scan of technical battlegrounds available with a Day Pass.

Inspector Profile: No Inspector Associated

Archive Data: 8 Decisions
Allowance Rate (Not Applicable)
62.5% ↑ High
National Average (Not Applicable)
35.5%

Inspector's Analysis

Appeal Decision Hearing held on 15 June 2016 Site visit made on 15 June 2016 by Julia Gregory BSc (Hons), BTP, MRTPI, MCMI an Inspector appointed by the Secretary of State for Communities and Local Government Decision date: 25 July 2016 Appeal Ref: APP/B3438/C/16/3146219 The Land to the north side of Dove House Farm, Blythe Bridge Road, Caverswall, Stoke on Trent, ST11 9EA  The appeal…

Full Analysis Locked

Unlock full text, site maps, and the evidence-ready PDF.

Unlock Case (£10)